Power station

A-Perustus executed the Kärppiö substation contract for Teuva, which included civil engineering and construction works.

The civil works contract included the installation of cable ducts and equipment foundations and an oil/water separation system for the transformers, in addition to the usual content.

The civil engineering works included site works of the portal foundations of the 110kW and 400kW fields, civil engineering works of the control room building without HVAC and electrical works, 2 transformer bunkers with transmission lines.

Site details

City

Teuva

Subscriber

Empower Plc

Year built

2021

Duration of work

8 months