{"id":10781,"date":"2024-08-26T12:32:02","date_gmt":"2024-08-26T09:32:02","guid":{"rendered":"https:\/\/anfra.fi\/?p=10781"},"modified":"2025-02-18T15:18:29","modified_gmt":"2025-02-18T13:18:29","slug":"anfras-strong-growth-continues-in-kevaalla-2024-deals-reflect-anfras-diversification","status":"publish","type":"post","link":"https:\/\/anfra.fi\/en\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\/","title":{"rendered":"Anfra's growth continues to be strong - The deals signed during 2024 reflect Anfra's diversification"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"10781\" class=\"elementor elementor-10781\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-bbf3008 e-con-full e-flex jltma-glass-effect-no e-con e-parent\" data-id=\"bbf3008\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-403c4a5 jltma-glass-effect-no elementor-widget elementor-widget-text-editor\" data-id=\"403c4a5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><em>It's time to summarise a little of the many new <\/em><em>interesting projects that we have not had time to talk about during the busy spring and summer. <\/em><em>informs. Our growth has continued to be strong and we have agreed new projects on a very broad front; from bridge building to industrial and energy construction, and from the Green Transition project to the renovation of the groundwater basin.<\/em><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0dca6f6 jltma-glass-effect-no elementor-widget elementor-widget-heading\" data-id=\"0dca6f6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Anfra to replace the Hepovirra bridge in Mikkeli<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-15f6473 jltma-glass-effect-no elementor-widget elementor-widget-image\" data-id=\"15f6473\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"473\" src=\"https:\/\/anfra.fi\/wp-content\/uploads\/2024\/08\/veneilysaimaa-silta-1024x606.webp\" class=\"attachment-large size-large wp-image-10911\" alt=\"\" srcset=\"https:\/\/anfra.fi\/wp-content\/uploads\/2024\/08\/veneilysaimaa-silta-1024x606.webp 1024w, https:\/\/anfra.fi\/wp-content\/uploads\/2024\/08\/veneilysaimaa-silta-500x296.webp 500w, https:\/\/anfra.fi\/wp-content\/uploads\/2024\/08\/veneilysaimaa-silta-768x454.webp 768w, https:\/\/anfra.fi\/wp-content\/uploads\/2024\/08\/veneilysaimaa-silta-18x12.webp 18w, https:\/\/anfra.fi\/wp-content\/uploads\/2024\/08\/veneilysaimaa-silta.webp 1327w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f16c5c1 jltma-glass-effect-no elementor-widget elementor-widget-text-editor\" data-id=\"f16c5c1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><em>Photo: Veneilysaimaa.com<\/em><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1b17266 jltma-glass-effect-no elementor-widget elementor-widget-text-editor\" data-id=\"1b17266\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The renovation of the Hepovirra Bridge, located in Mikkeli, Saimaa, supports Anfra's growth strategy in bridge and road construction. Anfra is the main contractor for the project. Implementation started in August 2024.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a0ed430 jltma-glass-effect-no elementor-widget elementor-widget-text-editor\" data-id=\"a0ed430\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>Demolition of old bridge structures, all necessary earthworks<br \/>including the construction of the road embankment at both ends of the bridge and the concrete structures of the new bridge, including new cast-in-place earthworks. The bridge itself will be a timber bridge, like the old bridge, and will be supplied by Versowood. We will then be responsible for all the finishing work before the bridge is put into service,\" says the project salesman for the project <strong>Sarita Karjalainen<\/strong> Anfralta.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-83ea7a8 jltma-glass-effect-no elementor-widget elementor-widget-heading\" data-id=\"83ea7a8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Anfra to implement Sibanye-Stillwater's Keliber lithium project\nconcrete construction contract in Kokkola<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-965a41b jltma-glass-effect-no elementor-widget elementor-widget-image\" data-id=\"965a41b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"800\" height=\"449\" src=\"https:\/\/anfra.fi\/wp-content\/uploads\/2024\/08\/Keliber-Tehdas-10.08.2024-1024x575.webp\" class=\"attachment-large size-large wp-image-10912\" alt=\"\" srcset=\"https:\/\/anfra.fi\/wp-content\/uploads\/2024\/08\/Keliber-Tehdas-10.08.2024-1024x575.webp 1024w, https:\/\/anfra.fi\/wp-content\/uploads\/2024\/08\/Keliber-Tehdas-10.08.2024-500x281.webp 500w, https:\/\/anfra.fi\/wp-content\/uploads\/2024\/08\/Keliber-Tehdas-10.08.2024-768x431.webp 768w, https:\/\/anfra.fi\/wp-content\/uploads\/2024\/08\/Keliber-Tehdas-10.08.2024-18x10.webp 18w, https:\/\/anfra.fi\/wp-content\/uploads\/2024\/08\/Keliber-Tehdas-10.08.2024.webp 1246w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6f28ea3 jltma-glass-effect-no elementor-widget elementor-widget-text-editor\" data-id=\"6f28ea3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Anfra Oy has contracted Sibanye-Stillwater's Keliber lithium project for concrete construction works at their Keliber lithium refinery in Kokkola. The contract includes the concrete construction of the stormwater basin, the construction of pipe bridges, the concrete flooring of the water treatment plant and, as a subcontractor to KJM, the concrete construction of the packing and dispatch building. The works have already started in early 2024 and will be completed in October 2024.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-66fcea8 jltma-glass-effect-no elementor-widget elementor-widget-text-editor\" data-id=\"66fcea8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>This concrete construction contract awarded to Anfra is part of a large-scale industrial project. Our contract covers a large construction area and includes many different types of concrete structures, requiring the extensive expertise of Anfra's specialists. The project strengthens our position in the industrial construction sector and gives us the opportunity to demonstrate our high level of expertise and commitment to quality. The employment impact will also be significant (around 30 people) for both Anfra and our subcontractors,\" says the project's project salesman, Sales Manager <strong>Niko Saarnio<\/strong> Anfralta.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8f4db02 jltma-glass-effect-no elementor-widget elementor-widget-text-editor\" data-id=\"8f4db02\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>For more information on the Sibanye-Stillwater Keliber lithium project, read:<br \/><a href=\"https:\/\/www.sibanyestillwater.com\/fi\/liiketoiminta\/eurooppa\/keliber\/\">https:\/\/www.sibanyestillwater.com<\/a><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2b65f75 jltma-glass-effect-no elementor-widget elementor-widget-heading\" data-id=\"2b65f75\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Anfra to implement Oulu Region Electricity's Green Transition -\nfoundation and civil engineering works<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ae739f5 jltma-glass-effect-no elementor-widget elementor-widget-text-editor\" data-id=\"ae739f5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Oulun Seudun S\u00e4hk\u00f6 (OSS) is investing in non-combustible heat production, green energy in the district heating networks of Liminga, Lumijoki and Ankkurilahti. A similar solution for emission-free district heat production will be built in each network. Anfra is contracting the entire civil engineering and foundation works for this Green Transition project as a KVR contract.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-04d2d9b jltma-glass-effect-no elementor-widget elementor-widget-text-editor\" data-id=\"04d2d9b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>This project fits perfectly with Anfra's \"Concrete builder worthy of our environment\"<br \/>-strategy. We have been very excited about this from the very beginning of the negotiations and are delighted to have been chosen to deliver such an exciting project. The project has started at the beginning of June and the estimated completion date for the commissioning of all sites is week 44\/2024. We believe that such projects will increase in the near future and this will therefore also be a great reference for us,\" says the project salesman. <strong>Riku Pitk\u00e4l\u00e4<\/strong> Anfralta.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e7bc7bb jltma-glass-effect-no elementor-widget elementor-widget-heading\" data-id=\"e7bc7bb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Anfra Nordic Ab also in a strong tailwind in Sweden\nmarket<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6aeeb89 jltma-glass-effect-no elementor-widget elementor-widget-text-editor\" data-id=\"6aeeb89\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Anfra's Swedish subsidiary, Anfra Nordic Ab, has seen strong growth in its business during the year.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b2b7bf5 jltma-glass-effect-no elementor-widget elementor-widget-text-editor\" data-id=\"b2b7bf5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>Projects have already been implemented, are underway and negotiations are well under way on new projects, including some quite large ones. In a very short time we have gained a comfortable foothold in this new market,\" says Anfra's Swedish Business Manager. <strong>Kai Kaarlej\u00e4rvi<\/strong>.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a114ffb jltma-glass-effect-no elementor-widget elementor-widget-text-editor\" data-id=\"a114ffb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Read here <a href=\"https:\/\/www.rakennuslehti.fi\/2024\/08\/oli-positiivinen-yllatys-etta-suomessa-hankkimamme-referenssit-olivat-todella-arvostettuja-anfra-loysi-vuodessa-jalansijan-ruotsissa\/\" target=\"_blank\" rel=\"noopener\">Construction magazine article<\/a> Anfra's work in Sweden.\u00a0<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-05f41b4 jltma-glass-effect-no elementor-widget elementor-widget-heading\" data-id=\"05f41b4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Anfra involved in substation construction contract in Boden<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4eb6826 jltma-glass-effect-no elementor-widget elementor-widget-text-editor\" data-id=\"4eb6826\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Anfra announced earlier in March 2024 that it had already signed an agreement with Linjemontage i Gr\u00e4rstorp AB to subcontract the construction of a substation in Boden.<br \/>Linjemontage is the main contractor in the project for Vattenfall Eldistribution AB.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9cb3c00 jltma-glass-effect-no elementor-widget elementor-widget-text-editor\" data-id=\"9cb3c00\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>Anfra is subcontractor for the structural design of the concrete structures and piling (limited content), piling, earthworks and landscaping, cast-in-place and precast concrete structures and steel fencing of the site. The cast-in-place concrete structures will be carried out<br \/>with environmental concrete to minimise the environmental impact of the site,\" says Kai Kaarlej\u00e4rvi.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-41b4f00 jltma-glass-effect-no elementor-widget elementor-widget-heading\" data-id=\"41b4f00\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Anfra to renovate the \u00d6vertorne\u00e5 power plant pool area\nas a full contract<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-76b1914 jltma-glass-effect-no elementor-widget elementor-widget-image\" data-id=\"76b1914\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1343\" height=\"873\" src=\"https:\/\/anfra.fi\/wp-content\/uploads\/2024\/06\/overtornea-maauimala-e1719308045436.webp\" class=\"attachment-full size-full wp-image-10784\" alt=\"\" srcset=\"https:\/\/anfra.fi\/wp-content\/uploads\/2024\/06\/overtornea-maauimala-e1719308045436.webp 1343w, https:\/\/anfra.fi\/wp-content\/uploads\/2024\/06\/overtornea-maauimala-e1719308045436-500x325.webp 500w, https:\/\/anfra.fi\/wp-content\/uploads\/2024\/06\/overtornea-maauimala-e1719308045436-1024x666.webp 1024w, https:\/\/anfra.fi\/wp-content\/uploads\/2024\/06\/overtornea-maauimala-e1719308045436-768x499.webp 768w, https:\/\/anfra.fi\/wp-content\/uploads\/2024\/06\/overtornea-maauimala-e1719308045436-18x12.webp 18w\" sizes=\"(max-width: 1343px) 100vw, 1343px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2c48a75 jltma-glass-effect-no elementor-widget elementor-widget-text-editor\" data-id=\"2c48a75\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><em><span style=\"font-weight: 400;\">Photo: work on the new pool area at the \u00d6vertorne\u00e5 power plant is progressing nicely.<\/span><\/em><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8165415 jltma-glass-effect-no elementor-widget elementor-widget-text-editor\" data-id=\"8165415\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Floodwaters from the Tornion River caused significant damage in spring 2023 in \u00d6vertorne\u00e5, Sweden<br \/>to the municipality's very popular Ekobadet hydroelectric power plant, destroying the entire pool area.<br \/>The ground pool has been closed since then and the municipality aims to have the ground pool open to the public again by summer 2025. After winning a public procurement tender, Anfra has signed a contract with \u00d6vertorne\u00e5 municipality for the complete renovation of the entire ground pool area, including concrete and earthworks.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-41bb944 jltma-glass-effect-no elementor-widget elementor-widget-text-editor\" data-id=\"41bb944\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>Our strong experience and significant references in industrial pool construction convinced the client of our expertise. The old damaged pool had already been removed and when we started work in May 2024, only a large pit was left. We are now building a new concrete-constructed pool area of about 40x11m, which will be finished with an epoxy coating.<br \/>Naturally, all earthworks and landscaping are included in the<br \/>our overall contract. Our part of the renovation of the power plant will be completed by the end of August 2024. We believe that the ground swimming pool will be back in active use by both locals and tourists from next summer,\" says Kai Kaarlej\u00e4rvi.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-da42026 jltma-glass-effect-no elementor-widget elementor-widget-spacer\" data-id=\"da42026\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"spacer.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-spacer\">\n\t\t\t<div class=\"elementor-spacer-inner\"><\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5118d8a jltma-glass-effect-no elementor-widget elementor-widget-text-editor\" data-id=\"5118d8a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Find out more about Anfra projects:<\/strong><\/p><p>Heikki Pentinpuro<br \/>sales director<br \/>Anfra Oy<br \/>heikki.pentinpuro@anfra.fi<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Anfra Ltd will continue its strong growth in 2024 with new bridge, industrial and green transition projects. Read more about Anfra's diverse projects and their impact on infrastructure and industrial construction.<\/p>","protected":false},"author":10,"featured_media":10912,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[1],"tags":[47],"class_list":["post-10781","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","tag-47"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Anfran kasvu jatkuu vahvana - Vuoden 2024 aikana tehdyt kaupat kuvaavat Anfran monipuolisuutta - Anfra<\/title>\n<meta name=\"description\" content=\"Anfra Oy jatkaa vahvaa kasvua vuonna 2024 uusien siltarakennus-, teollisuus- ja vihre\u00e4n siirtym\u00e4n hankkeiden my\u00f6t\u00e4. Lue lis\u00e4\u00e4 Anfran monipuolisista projekteista ja niiden vaikutuksista infra- ja teollisuusrakentamisen alalla.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/anfra.fi\/en\/anfras-strong-growth-continues-in-kevaalla-2024-deals-reflect-anfras-diversification\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Anfran kasvu jatkuu vahvana - Vuoden 2024 aikana tehdyt kaupat kuvaavat Anfran monipuolisuutta - Anfra\" \/>\n<meta property=\"og:description\" content=\"Anfra Oy jatkaa vahvaa kasvua vuonna 2024 uusien siltarakennus-, teollisuus- ja vihre\u00e4n siirtym\u00e4n hankkeiden my\u00f6t\u00e4. Lue lis\u00e4\u00e4 Anfran monipuolisista projekteista ja niiden vaikutuksista infra- ja teollisuusrakentamisen alalla.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/anfra.fi\/en\/anfras-strong-growth-continues-in-kevaalla-2024-deals-reflect-anfras-diversification\/\" \/>\n<meta property=\"og:site_name\" content=\"Anfra\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/anfraoy\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-08-26T09:32:02+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-02-18T13:18:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/anfra.fi\/wp-content\/uploads\/2024\/08\/Keliber-Tehdas-10.08.2024.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1246\" \/>\n\t<meta property=\"og:image:height\" content=\"700\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Tommi\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Tommi\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/anfra.fi\\\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/anfra.fi\\\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\\\/\"},\"author\":{\"name\":\"Tommi\",\"@id\":\"https:\\\/\\\/anfra.fi\\\/#\\\/schema\\\/person\\\/3ec8a8a7c5505d0251958bba8ee617d0\"},\"headline\":\"Anfran kasvu jatkuu vahvana &#8211; Vuoden 2024 aikana tehdyt kaupat kuvaavat Anfran monipuolisuutta\",\"datePublished\":\"2024-08-26T09:32:02+00:00\",\"dateModified\":\"2025-02-18T13:18:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/anfra.fi\\\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\\\/\"},\"wordCount\":755,\"publisher\":{\"@id\":\"https:\\\/\\\/anfra.fi\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/anfra.fi\\\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/anfra.fi\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/Keliber-Tehdas-10.08.2024.webp\",\"keywords\":[\"1\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/anfra.fi\\\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\\\/\",\"url\":\"https:\\\/\\\/anfra.fi\\\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\\\/\",\"name\":\"Anfran kasvu jatkuu vahvana - Vuoden 2024 aikana tehdyt kaupat kuvaavat Anfran monipuolisuutta - Anfra\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/anfra.fi\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/anfra.fi\\\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/anfra.fi\\\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/anfra.fi\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/Keliber-Tehdas-10.08.2024.webp\",\"datePublished\":\"2024-08-26T09:32:02+00:00\",\"dateModified\":\"2025-02-18T13:18:29+00:00\",\"description\":\"Anfra Oy jatkaa vahvaa kasvua vuonna 2024 uusien siltarakennus-, teollisuus- ja vihre\u00e4n siirtym\u00e4n hankkeiden my\u00f6t\u00e4. Lue lis\u00e4\u00e4 Anfran monipuolisista projekteista ja niiden vaikutuksista infra- ja teollisuusrakentamisen alalla.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/anfra.fi\\\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/anfra.fi\\\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/anfra.fi\\\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\\\/#primaryimage\",\"url\":\"https:\\\/\\\/anfra.fi\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/Keliber-Tehdas-10.08.2024.webp\",\"contentUrl\":\"https:\\\/\\\/anfra.fi\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/Keliber-Tehdas-10.08.2024.webp\",\"width\":1246,\"height\":700},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/anfra.fi\\\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/anfra.fi\\\/fi\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Anfran kasvu jatkuu vahvana &#8211; Vuoden 2024 aikana tehdyt kaupat kuvaavat Anfran monipuolisuutta\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/anfra.fi\\\/#website\",\"url\":\"https:\\\/\\\/anfra.fi\\\/\",\"name\":\"Anfra Oy\",\"description\":\"Kest&auml;v&auml;n tekij&auml;\",\"publisher\":{\"@id\":\"https:\\\/\\\/anfra.fi\\\/#organization\"},\"alternateName\":\"Anfra\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/anfra.fi\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/anfra.fi\\\/#organization\",\"name\":\"Anfra Oy\",\"alternateName\":\"Anfra\",\"url\":\"https:\\\/\\\/anfra.fi\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/anfra.fi\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/anfra.fi\\\/wp-content\\\/uploads\\\/2024\\\/06\\\/a.jpg\",\"contentUrl\":\"https:\\\/\\\/anfra.fi\\\/wp-content\\\/uploads\\\/2024\\\/06\\\/a.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"Anfra Oy\"},\"image\":{\"@id\":\"https:\\\/\\\/anfra.fi\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/anfraoy\\\/\",\"https:\\\/\\\/www.instagram.com\\\/anfra_oy\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/anfra-oy\",\"https:\\\/\\\/www.tiktok.com\\\/@anfra_oy\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/anfra.fi\\\/#\\\/schema\\\/person\\\/3ec8a8a7c5505d0251958bba8ee617d0\",\"name\":\"Tommi\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9a1096a4c9b2d8c2447a7fe0235d89e4a93aa209be3164cc6725372314c1f2a3?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9a1096a4c9b2d8c2447a7fe0235d89e4a93aa209be3164cc6725372314c1f2a3?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9a1096a4c9b2d8c2447a7fe0235d89e4a93aa209be3164cc6725372314c1f2a3?s=96&d=mm&r=g\",\"caption\":\"Tommi\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Anfra's growth continues to be strong - Deals in 2024 reflect Anfra's diversification - Anfra","description":"Anfra Ltd will continue its strong growth in 2024 with new bridge, industrial and green transition projects. Read more about Anfra's diverse projects and their impact on infrastructure and industrial construction.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/anfra.fi\/en\/anfras-strong-growth-continues-in-kevaalla-2024-deals-reflect-anfras-diversification\/","og_locale":"en_US","og_type":"article","og_title":"Anfran kasvu jatkuu vahvana - Vuoden 2024 aikana tehdyt kaupat kuvaavat Anfran monipuolisuutta - Anfra","og_description":"Anfra Oy jatkaa vahvaa kasvua vuonna 2024 uusien siltarakennus-, teollisuus- ja vihre\u00e4n siirtym\u00e4n hankkeiden my\u00f6t\u00e4. Lue lis\u00e4\u00e4 Anfran monipuolisista projekteista ja niiden vaikutuksista infra- ja teollisuusrakentamisen alalla.","og_url":"https:\/\/anfra.fi\/en\/anfras-strong-growth-continues-in-kevaalla-2024-deals-reflect-anfras-diversification\/","og_site_name":"Anfra","article_publisher":"https:\/\/www.facebook.com\/anfraoy\/","article_published_time":"2024-08-26T09:32:02+00:00","article_modified_time":"2025-02-18T13:18:29+00:00","og_image":[{"width":1246,"height":700,"url":"https:\/\/anfra.fi\/wp-content\/uploads\/2024\/08\/Keliber-Tehdas-10.08.2024.webp","type":"image\/webp"}],"author":"Tommi","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Tommi","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/anfra.fi\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\/#article","isPartOf":{"@id":"https:\/\/anfra.fi\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\/"},"author":{"name":"Tommi","@id":"https:\/\/anfra.fi\/#\/schema\/person\/3ec8a8a7c5505d0251958bba8ee617d0"},"headline":"Anfran kasvu jatkuu vahvana &#8211; Vuoden 2024 aikana tehdyt kaupat kuvaavat Anfran monipuolisuutta","datePublished":"2024-08-26T09:32:02+00:00","dateModified":"2025-02-18T13:18:29+00:00","mainEntityOfPage":{"@id":"https:\/\/anfra.fi\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\/"},"wordCount":755,"publisher":{"@id":"https:\/\/anfra.fi\/#organization"},"image":{"@id":"https:\/\/anfra.fi\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\/#primaryimage"},"thumbnailUrl":"https:\/\/anfra.fi\/wp-content\/uploads\/2024\/08\/Keliber-Tehdas-10.08.2024.webp","keywords":["1"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/anfra.fi\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\/","url":"https:\/\/anfra.fi\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\/","name":"Anfra's growth continues to be strong - Deals in 2024 reflect Anfra's diversification - Anfra","isPartOf":{"@id":"https:\/\/anfra.fi\/#website"},"primaryImageOfPage":{"@id":"https:\/\/anfra.fi\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\/#primaryimage"},"image":{"@id":"https:\/\/anfra.fi\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\/#primaryimage"},"thumbnailUrl":"https:\/\/anfra.fi\/wp-content\/uploads\/2024\/08\/Keliber-Tehdas-10.08.2024.webp","datePublished":"2024-08-26T09:32:02+00:00","dateModified":"2025-02-18T13:18:29+00:00","description":"Anfra Ltd will continue its strong growth in 2024 with new bridge, industrial and green transition projects. Read more about Anfra's diverse projects and their impact on infrastructure and industrial construction.","breadcrumb":{"@id":"https:\/\/anfra.fi\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/anfra.fi\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/anfra.fi\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\/#primaryimage","url":"https:\/\/anfra.fi\/wp-content\/uploads\/2024\/08\/Keliber-Tehdas-10.08.2024.webp","contentUrl":"https:\/\/anfra.fi\/wp-content\/uploads\/2024\/08\/Keliber-Tehdas-10.08.2024.webp","width":1246,"height":700},{"@type":"BreadcrumbList","@id":"https:\/\/anfra.fi\/anfran-kasvu-jatkuu-vahvana-kevaalla-2024-tehdyt-kaupat-kuvaavat-anfran-monipuolisuutta\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/anfra.fi\/fi\/"},{"@type":"ListItem","position":2,"name":"Anfran kasvu jatkuu vahvana &#8211; Vuoden 2024 aikana tehdyt kaupat kuvaavat Anfran monipuolisuutta"}]},{"@type":"WebSite","@id":"https:\/\/anfra.fi\/#website","url":"https:\/\/anfra.fi\/","name":"Anfra Oy","description":"Kest&auml;v&auml;n tekij&auml;","publisher":{"@id":"https:\/\/anfra.fi\/#organization"},"alternateName":"Anfra","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/anfra.fi\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/anfra.fi\/#organization","name":"Anfra Oy","alternateName":"Anfra","url":"https:\/\/anfra.fi\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/anfra.fi\/#\/schema\/logo\/image\/","url":"https:\/\/anfra.fi\/wp-content\/uploads\/2024\/06\/a.jpg","contentUrl":"https:\/\/anfra.fi\/wp-content\/uploads\/2024\/06\/a.jpg","width":1920,"height":1080,"caption":"Anfra Oy"},"image":{"@id":"https:\/\/anfra.fi\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/anfraoy\/","https:\/\/www.instagram.com\/anfra_oy\/","https:\/\/www.linkedin.com\/company\/anfra-oy","https:\/\/www.tiktok.com\/@anfra_oy"]},{"@type":"Person","@id":"https:\/\/anfra.fi\/#\/schema\/person\/3ec8a8a7c5505d0251958bba8ee617d0","name":"Tommi","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9a1096a4c9b2d8c2447a7fe0235d89e4a93aa209be3164cc6725372314c1f2a3?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9a1096a4c9b2d8c2447a7fe0235d89e4a93aa209be3164cc6725372314c1f2a3?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9a1096a4c9b2d8c2447a7fe0235d89e4a93aa209be3164cc6725372314c1f2a3?s=96&d=mm&r=g","caption":"Tommi"}}]}},"_links":{"self":[{"href":"https:\/\/anfra.fi\/en\/wp-json\/wp\/v2\/posts\/10781","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/anfra.fi\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/anfra.fi\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/anfra.fi\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/anfra.fi\/en\/wp-json\/wp\/v2\/comments?post=10781"}],"version-history":[{"count":42,"href":"https:\/\/anfra.fi\/en\/wp-json\/wp\/v2\/posts\/10781\/revisions"}],"predecessor-version":[{"id":11943,"href":"https:\/\/anfra.fi\/en\/wp-json\/wp\/v2\/posts\/10781\/revisions\/11943"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/anfra.fi\/en\/wp-json\/wp\/v2\/media\/10912"}],"wp:attachment":[{"href":"https:\/\/anfra.fi\/en\/wp-json\/wp\/v2\/media?parent=10781"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/anfra.fi\/en\/wp-json\/wp\/v2\/categories?post=10781"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/anfra.fi\/en\/wp-json\/wp\/v2\/tags?post=10781"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}