Anfra Oy and Stora Enso sign contracts for a new board mill

Anfra Oy and Stora Enso have signed contracts for the local casting and prefabrication of the wood processing and power plant areas related to the billion-euro investment in Stora Enso's Oulu plant. They involve approximately 10 000 - 12 000 cubic metres of concrete, with the largest single cast being 1 800 cubic metres.

Metsä Group relies on the A-foundation

A-Perustus has been heavily involved in Metsä Group's Kemi bioproduct plant project. The cooperation between the companies has been very smooth and has increased A-Perustus' position as a strong industrial construction expert.

A-foundation strongly involved in the sawmill industry

A-Perustus has already been involved in several projects in the sawmill industry, which have included structural design, civil engineering and concrete construction. These have brought with them a strong knowledge of how to take into account the specificities of sawmills.

SPEEDING UP THE DELIVERY OF CIVIL PROTECTION

The construction of a cast-in-place shelter typically takes between two and three weeks, including the demolition of the mould. The time is also extended by the need for post-tensioning of the vault. The size of the shelter is the main factor affecting the lead time, but the organisation of the site also plays an important role.