Slab and floor concrete works for the battery materials factory in Kotka. Approximately 9 000 cubic meters of concrete and 1 600 tons of structural steel were used for all the floors in the main factory building. The contract included related earthworks and infrastructure installations.

Aiemmin toteutimme hankkeelle perustusurakan. Perustuksia tehtiin 2,7 hehtaarin tehdasalueelle, joihin käytettiin noin 10 000 kuutiota betonia ja 800 tonnia terästä.