Luvian saha

Structural Design of the New Drying Kiln and Canopy Extensions

Drying Kiln Building:
275 m2GFA (Gross Floor Area), 2 900 m3 (building)
Strip footing foundation
Ground floor slab (slab-on-grade)
Precast wall panels (22 pcs)
Precast columns (6 pieces)
Hollow-core slabs (25 pieces)
Precast half-slabs / Filigree slabs
Steel strucutures (16 810 kg)

Green End Canopies:
1 040 m2GFA, 8 360 m3 (canopy)
Pad footing foundations (isolated column footings)
Fiber-reinforced concreteslab
Steel structures (57 310 kg)

Sorting Bin Hall Extension
322 m2GFA, 1 940 m3 (canopy)
Pile cap foundations
Steel structures (6 040 kg)

Stickering Building
450 m2GFA, 3 820 m3 (building)
Strip footing foundations
Steel structures (2 800 kg)

Sticker Conveyor Canopy:
260 m2GFA, 2 020 m3 (canopy)
Fiber-reinforced concrete slab
Fibre-reinforced concrete slab
Steel structures (14 675 kg)

Total concrete volume: 2 420 m3