"Tell me my strengths" - How we set up a new strategy

The strategy work in the summer of '22 started from a completely different angle to anything that had gone before. I had read that creativity comes to the fore when you feel very safe in a group where you should dare to throw your ideas into the ring. I see myself as a doer rather than a softball. That's why the threshold to throw myself into this was high, but I decided to take the plunge.
Carbon dioxide emissions from oversizing concrete structures

The industry lacks a genuine desire and skill to optimise structures and structures are becoming heavier than necessary, both in steel and concrete. As a responsible operator, we are determined to make this clear, with minimising environmental impact being a key part of our ISO 14001 environmental management system.
The A-foundation is now Anfra

A-Perustus is now Anfra!
During recent years, A-Perustus has focused its efforts on developing the company from
building foundations to doing heavyweight concrete construction work.
Metsä Group relies on the A-foundation

A-Perustus has been heavily involved in Metsä Group's Kemi bioproduct plant project. The cooperation between the companies has been very smooth and has increased A-Perustus' position as a strong industrial construction expert.
A-foundation involved in the construction of the Junnikkala sawmill

A-Perustus will supply all concrete structures to be cast on site for the Junnikkala sawmill to be built in Oulu.
A-foundation strongly involved in the sawmill industry

A-Perustus has already been involved in several projects in the sawmill industry, which have included structural design, civil engineering and concrete construction. These have brought with them a strong knowledge of how to take into account the specificities of sawmills.
STAFF SATISFACTION SURVEY RESULTS PUT A SMILE ON THE FACE
In September we conducted a staff satisfaction survey and now we are pleased to publish the results with you!
A-FOUNDATION FOR COOPERATION WITH PÖLKKY OY

A-Perustus continues to be a partner in major sawmill projects.
SPEEDING UP THE DELIVERY OF CIVIL PROTECTION

The construction of a cast-in-place shelter typically takes between two and three weeks, including the demolition of the mould. The time is also extended by the need for post-tensioning of the vault. The size of the shelter is the main factor affecting the lead time, but the organisation of the site also plays an important role.
A-FOUNDATION DESIGN DEPARTMENT NOW MORE VERSATILE

In May, A-Perustus strengthened its structural design with the addition of two people. Previously focused on concrete construction, the structural design has been developed into a more holistic structural design, which is believed to better serve the needs of clients. The reinforcement of the design department will also enable structural design to be provided as a stand-alone service.